Page 14 of 16
13.0 Cure Schedule
A two-pass film of seven (7) to ten (10) mils (175-250 microns) dries to a touch-dry (gel) finish within three (3) hours at 72¡¡F (22.2¡¡C) and dries to a 70% cure in twelve (12) hours. Cure times lengthen at lower temperatures and shorten at higher temperatures.